Projects
Serra do Mel PV Plant
Enertis Applus+ assisted Voltalia providing its specialised and independent advice during the pre-manufacturing, manufacturing, and pre-shipment phases. As part of the services that were performed, the company carried out vendor surveillance, namely factory inspections, in China to oversee and evaluate the raw materials for solar PV modules.
Also, Enertis Applus+ assessed the compliance of the manufacturing process with the established quality standards and its experienced quality inspectors supervised the entire manufacturing process in China. The services also included pre-shipment factory acceptance tests (FAT).
Enertis Applus+ also performed additional and specific tests on the modules in its accredited external laboratory (ISO/IEC 17025, ISO/IEC 17020 and CBTL/IECEE), including the determination of the maximum power under standard conditions, visual, EL, Light Induced Degradation (LID), Potential Induced Degradation (PID) and the Light and Elevated Temperature Induced Degradation Index (LeTID) tests. These tasks are necessary to evaluate the quality and optimal performance of the modules. Similarly, specific tests were carried out on inverters and solar trackers to verify their compliance with predefined technical requirements.